Tanya Jepun

Mount Aso crater still closed (alert level 2 since 1 September 2026): Kusasenri, Daikanbo and the museum are open

This week's news · Checked 2026-09-17

Grassland below the Aso volcanoes, Kumamoto
Photo: Gaku Suyama / Unsplash

Short answer. You can visit Aso, but not the crater. Mount Aso has been at alert level 2 since 16:00 on 1 September 2026, and entry within about 1 km of the Nakadake first crater is still banned (JMA and the Aso Volcano Disaster Prevention Council, checked 1 November 2026). According to Watabi (14 September 2026), the crater, the Aso Park Road to the rim and the crater shuttle bus are closed, while Kusasenri (free, parking ≈ ¥500), the Daikanbo viewpoint, Komezuka (viewing only) and the Aso Volcano Museum (adults ¥1,300) are open. So plan Aso for the grassland and the caldera, and don't promise the kids the crater until the level drops to 1 and the Aso Park Road reopens.

Checked 1 November 2026: alert level 2 and the 1 km entry ban (JMA, aso-volcano.jp). Other details: Watabi, 14 September 2026, checked 17 September 2026.

What happened. The Japan Meteorological Agency (JMA) lowered the Mount Aso alert level from 3 to 2 on 1 September 2026 at 16:00, after raising it to 3 on 14 August. The 1 km entry ban around the Nakadake crater stays: the crater, the Aso Park Road (toll road to the rim) and the crater shuttle bus are still closed. Crater viewing has been restricted since a sightseeing helicopter crashed into the first crater on 20 January 2026. The Tozan bus from Aso Station to Aso Sanjo Terminal resumed on 2 September (Watabi, citing the Aso Volcano Disaster Prevention Council and JMA, verified 14 September 2026).

What it means for you.

Sources

ItemSourceChecked
Alert level 2 (crater-area warning) since 16:00 on 1 September 2026; keep out of about 1 km around the Nakadake first craterJapan Meteorological Agency (JMA), Aso volcano information (in Japanese) — data.jma.go.jp1 Nov 2026
1 km entry ban around the crater still in forceAso Volcano Disaster Prevention Council (in Japanese) — aso-volcano.jp1 Nov 2026
Level raised to 3 on 14 August; crater, Aso Park Road and crater shuttle closed; crater viewing restricted since the helicopter crash on 20 January 2026; Tozan bus to Aso Sanjo Terminal resumed 2 SeptemberWatabi, "Is Mt. Aso's Crater Open? 2026 Closure Status & Access" (in English, citing aso-volcano.jp and JMA) — watabi.org14 Sep 2026 (Watabi); 17 Sep 2026
Kusasenri (free, parking ≈ ¥500), Daikanbo, Komezuka (viewing only) and Aso Volcano Museum (adults ¥1,300) openWatabi (same page) — watabi.org14 Sep 2026 (Watabi); 17 Sep 2026

Before you fly: Map of 231 halal places & prayer rooms (US$6.99) — December Edition, 15 Nov.

Affiliate links may be used; your price does not change.

Source

Watabi (citing the Aso Volcano Disaster Prevention Council and JMA), verified 14 September 2026 (in English) · 2026-09-17

More news on the home page